Utilization of Control Energy

(period from 1 October 2015)


Internal

Please choose the period and the display format:

Period

from:
to:

Format
show table
download CSV file

Data Gas type Network zone positive (Balancing of Shortfalls) [MWh] negative (Balancing of Surpluses) [MWh]
01/07/2020 H GASCADE 25,055.6770 25,364.9610
01/07/2020 H GUD-H 3,260.9720 7,934.5600
01/07/2020 H ONTRAS 9,471.3810 4,697.4560
01/07/2020 L GTG 0 0
01/07/2020 L GUD-L 1,575.0190 1,205.6210
01/07/2020 L NOWEGA 0 0
02/07/2020 H GASCADE 32,809.1630 3,870.2070
02/07/2020 H GUD-H 6,744.1150 995.7380
02/07/2020 H ONTRAS 6,822.9480 13,580.6710
02/07/2020 L GTG 0 0
02/07/2020 L GUD-L 2,011.6330 1,343.7830
02/07/2020 L NOWEGA 0 0
03/07/2020 H GASCADE 33,971.1690 6,377.2480
03/07/2020 H GUD-H 16,338.1400 1,755.8050
03/07/2020 H ONTRAS 9,888.6090 6,183.0500
03/07/2020 L GTG 0 0
03/07/2020 L GUD-L 1,465.4590 970.9380
03/07/2020 L NOWEGA 0 0
04/07/2020 H GASCADE 32,290.0470 4,209.0040
04/07/2020 H GUD-H 5,789.7340 7,107.0200
04/07/2020 H ONTRAS 6,776.8390 5,324.9810
04/07/2020 L GTG 0 0
04/07/2020 L GUD-L 1,522.9520 2,592.6900
04/07/2020 L NOWEGA 0 0
05/07/2020 H GASCADE 14,423.9180 20,585.1310
05/07/2020 H GUD-H 659.5390 9,301.1380
05/07/2020 H ONTRAS 1,745.3780 6,728.4820
05/07/2020 L GTG 0 0
05/07/2020 L GUD-L 738.3380 1,927.0310
05/07/2020 L NOWEGA 0 0

No responsibility is taken for the correctness of the data and exclusions of liability of GASPOOL Balancing Services GmbH apply here.

The annual VTP consultation took place from 25 May to 7 June 2020. Over 40 participants accepted this invitation and evaluated the VHP services of GASPOOL. The results of the consultation you will find here.

Read more

GASPOOL starts a Control Energy Tender for Flexibility for the winter period 2020/21. Bits can be submitted from 29 june until 10 July 2020.

Read more

Information about handling the virus and business continuity

Read more